What will India's batteries do to its coal plants?

Run them level. By our model, the batteries operating, under construction, awarded and out to tender on 30 September 2026 are a little more than it takes to hold coal generation flat through an average summer day. Whether India then burns less coal depends on what charges them.

13 November 2026 · Battery count as on 30 September 2026

Six months

On 31 March 2026 India had 0.8 gigawatt-hours (GWh) of grid batteries in operation. On 30 September 2026 it had 14.5.[1] The fleet grew to 18 times its size in six months.

It is still small. 14.5 GWh is what India's grid uses in about 4 minutes of a summer day. But more is on the way than has arrived. The Central Electricity Authority's count lists 79 GWh under construction, 29 GWh awarded to a builder and 76 GWh in tenders not yet decided. With what is operating, that is 198 GWh.[1]

India's grid batteries on 30 September 2026, by how far along they are

Gigawatt-hours (GWh). The bar is as long as the plan for March 2032

StageProjectsCan deliver, GWHolds, GWh
In operation195.314.5
Under construction6327.779.0
Awarded289.728.9
In tender8520.476.0
All four19563.1198.4
Projects of 1 MWh or more. Source: Central Electricity Authority, crediting the India Energy Storage Alliance; the plan is the National Electricity Plan of 2023.

The national plan made in 2023 asks for 34 GWh of batteries by March 2027 and 236 GWh by March 2032.[2] The authority's own timeline has 32 GWh in operation by March 2027.[1]

Counts of this fleet differ. JMK Research had 9.6 GWh commissioned at the end of August.[3] The authority had 14.5 GWh a month later. We use the authority's count and cannot reconcile the two.

Our last piece found that India's extra demand in 2026 came around the clock, and that after dark coal met most of it. This one asks what a battery fleet of the size India has put on paper would do to those coal plants.

What a grid battery is

A grid battery is rows of steel containers beside a substation, each packed with lithium cells. Around 90% of those now being installed use lithium iron phosphate, a chemistry that is cheaper than the kind in most electric cars and better suited to being cycled every day.[4]

It has two sizes. Power, in megawatts or gigawatts, is how fast it can give electricity back. Energy, in megawatt-hours or gigawatt-hours, is how much it holds. Divide the second by the first and you have how long it lasts at full power. India's operating fleet can deliver 5.3 GW and holds 14.5 GWh: 2.7 hours.[1]

Three things follow, and the rest of this piece turns on them.

  • A battery generates nothing. It takes electricity at one hour and gives it back at another.
  • It gives back less than it took. India's standard contract holds a battery to 85%, measured where it meets the grid.[5] For every 100 units delivered in the evening, about 118 were taken earlier in the day.
  • It is short. A fleet that lasts under three hours cannot carry a night that lasts eleven. It can take the top off one.

New orders are for longer batteries. Of the storage put out to tender from April to August 2026, four-hour systems were 41% and two-hour systems 40%.[3]

Where batteries already carry the evening

The world installed 108 GW of batteries in 2025, 40% more than the year before, and around 60% of it was in China.[4]

California shows what a large fleet does to a grid with a lot of solar. The state counted 21,112 megawatts of batteries in August 2026, against under 700 in 2019, most of them built to last four hours.[6] On the grid that serves about 80% of the state, 17,285 MW were installed at the end of October. The highest demand that grid has ever met is 52,061 MW.[7] For as long as they last, its batteries can cover 33% of that.

What fell was gas. Comparing January to June of 2024 with the same months of 2026, the state's energy commission found solar use up 22% and gas use down 51%, while battery capacity grew 80%.[6] A gas plant can stop at noon and start again at dusk. Most coal plants cannot, which is where India's case parts from California's.

India's 5.3 GW in operation is 2% of the 270.8 GW its grid met at its highest in 2026.[8] Everything in the authority's count, built, would be 23%.

What India's fleet would do to an average day

To see what a fleet of this size is good for, we ran one on paper. Take coal's average day from April to September 2026, read from the grid operator's 15-minute figures.[8] Give the fleet one job: keep coal generation as level as it can. Once a day it discharges into the hours when coal is highest and charges in the hours when coal is lowest, never faster than its power rating, and it gives back 85% of what it takes.

This is a model, not a forecast. No fleet is run this way, and the ways it differs from a real grid are listed at the end.

Coal's average day, with three sizes of battery fleet

Coal and lignite generation in gigawatts (GW), April to September 2026. The scale starts at 100. Modelled

100120140160180Midnight6 amNoon6 pmMidnightChargingDischarging120.5 GW172 As metered168 Batteries in operation160 And under construction154 And awarded or in tender
The thick line is coal and lignite generation as metered, averaged over 182 days. Each thinner line is the same day with a battery fleet run to keep coal level; the figure beside it is coal's highest reading. Modelled by us from Grid Controller of India and Central Electricity Authority figures.
Coal's day with each fleet
FleetHolds, GWhCan deliver, GWCoal's highest, average dayCoal's lowest, average dayCoal's highest, 3 June 2026
No batteries171.8120.5189.0
In operation14.55.3167.7125.8184.4
And under construction93.533.0159.9142.5176.0
And awarded or in tender198.463.1153.8153.8167.6

Gigawatts of coal and lignite generation unless marked. Each row adds to the fleet in the row above. Modelled, except the first row.

The fleet operating today takes 4 GW off coal's evening high, from 172 GW to 168. With everything under construction it comes down to 160. With everything awarded or in tender as well, coal stops moving. It runs at 154 GW from midnight to midnight, and 20 GWh of the fleet is left over.

That is the finding. Making coal run level through an average summer day takes 178 GWh delivered each evening. India has 198 GWh of batteries operating, under construction, awarded or in tender.

On the worst evening the cut is larger. Coal generation was highest at 10:45 pm on 3 June 2026, at 189.0 GW. Run on that day's readings, the whole fleet would have held it to 168 GW: 21 GW less coal needed at the hour the coal fleet is sized for. The Ministry of Power plans at least 97 GW more coal and lignite capacity by 2034-35.[9]

What charges it

Now look at the middle of the chart. As the evening comes down, midday goes up. The fleet charges around noon, and in the model the electricity comes from coal plants that turn down less than they do now. Coal's lowest reading rises from 120.5 GW to 153.8.

So coal burns no less. It burns a little more, because the battery gives back 85%: about 31 GWh a day more, on 3,659.

That is not a fault in the batteries. A battery moves electricity, and what it does to coal depends on what fills it. The government has said as much about part of the fleet. Of the 30 GWh its second subsidy scheme supports, 5 GWh went to NTPC, the state-owned generator, “to support electricity demand during non-solar hours and optimize the utilization of existing thermal and transmission infrastructure”.[10]

Fill the same fleet from new solar and the sum turns over. Coal keeps turning down at noon as it does now, the evening still comes off, and every unit delivered after dark is a unit coal did not generate. Delivering 178 GWh each evening takes 209 GWh of solar each day, on top of everything solar does already. The solar plants the grid operator meters generated 588 GWh on the average day. The batteries would need 36% more.

Coal would then generate 178 GWh a day less: 5% of what it generates now.

There is one case where a battery cuts coal with no new solar at all: when solar is being switched off at noon because the grid cannot take it. A battery charged from that is filled with electricity that would otherwise not exist. We could not establish how much solar India switches off, so the model leaves it out.

Policy points at pairing the two. In February 2025 the Central Electricity Authority advised that new solar projects come with storage of at least 10% of their capacity, lasting two hours.[2]

The price, and how little is built

Utilities in India buy grid batteries by auction. A builder bids a monthly rent for each megawatt, and the buyer, usually a state's electricity distributor, decides when the battery charges and discharges.

The first large auction, for 500 MW lasting two hours, settled at Rs 10.83 lakh a megawatt a month, which the power minister put at about Rs 10.18 for each unit delivered.[11] In February 2026 Gujarat's buyer paid Rs 2.10 lakh for two-hour batteries.[3] By the minister's conversion that is about Rs 2 a unit.

Then the fall stopped. In August Gujarat paid Rs 2.32 lakh, 10% more. West Bengal, buying four-hour batteries, paid Rs 3.47 lakh in January and Rs 4.35 lakh in August, 25% more. Cell prices did not rise with them. In China a kilowatt-hour of lithium iron phosphate cells cost about $54 in August and was still getting cheaper; landed in India, cells and containers cost 14% to 23% more.[3]

What the auctions have not yet produced is batteries. JMK Research counts about 54 GW awarded, and finds that projects built under contract to a utility come to 1.3% of that. Most of what operates today was built to sell on the open market.[3]

The government's own figures say the same. Its two subsidy schemes cover 43.8 GWh. By 23 July 2026, purchase agreements were signed for 32.3 GWh, financing was in place for 11.5 GWh, and 0.5 GWh was operating. A project under the second scheme has 18 months from its agreement to start.[10]

The subsidised batteries on 23 July 2026
How far alongGWhShare
Covered by the two schemes43.8100%
Purchase agreement signed32.374%
Financing in place11.526%
Operating0.51%

Source: Ministry of Power, reply in the Lok Sabha. Shares are ours.

On 4 November 2026 the Cabinet approved a third scheme: Rs 14,500 crore towards 92 GWh of storage by 2030-31, of which 30 GWh is batteries and 60 GWh is pumped storage, water moved uphill at noon and run back down at night. Batteries it supports must be at least 40% Indian by content.[12] The incentive scheme for Indian cell factories aims at 50 GWh of capacity, 10 GWh of it for the grid.[2]

Batteries are half the plan. For March 2032 it asks for 175 GWh of pumped storage beside the 236 GWh of batteries: 411 GWh in all.[2]

What it would take

Delivered each evening to hold coal level on the average day, April to September 2026
178 GWh
Batteries in operation on 30 September 2026
14.5 GWh
Those, and every battery under construction
93.5 GWh
Those, and every battery awarded or in tender
198.4 GWh
New solar needed each day to fill 178 GWh of delivery
209 GWh
All the solar the grid operator metered on the average day
588 GWh

India has put on paper enough batteries to level coal's summer day. 7% of them exist. Whether the rest are built turns on auction prices that have started to rise, and on financing that 26% of the subsidised capacity had in July.

What they do to coal turns on what is built beside them. Charged by coal plants, batteries make those plants steadier and spare India some new ones. Charged by new solar, they take coal out of the evening. So the fleet is worth counting two ways: the GWh in operation, and the solar added at noon to fill it.

What this does not show

  • One job. The model runs every battery to level coal. Real batteries are run for their owners' contracts and for prices, and many are contracted for two cycles a day, to meet a morning peak as well as an evening one.
  • No wires. The model treats India as one point. A battery in Rajasthan cannot relieve a coal plant in Bihar if the line between them is full.
  • Only coal moves. Hydro and gas plants also follow the evening. Batteries would take some of their work, and less of coal's than drawn.
  • Summer only. The average day covers April to September 2026. Winter days are shaped differently, and an average day is not any real day.
  • Ratings as printed. The fleet is counted at its rated power and energy, every day, with no faults and no ageing. 85% is the contract's floor, and a battery may do better.
  • A pipeline is not a fleet. 38% of the GWh in the authority's count is in tenders nobody has yet won. Tenders are cancelled; we found counts of cancellations and could not read their sources.
  • No person has checked these figures against the source. We have not yet read the grid operator's terms for reuse. Treat the figures with care.

Sources

  1. Central Electricity Authority, Status of development and deployment of Battery Energy Storage Systems in India as on 30.09.2026. It counts projects of 1 MWh or more, treats a project with a signed purchase agreement as under construction, and credits the India Energy Storage Alliance for the figures.
  2. Ministry of Power, “Grid stability and energy storage”, reply in the Rajya Sabha, 27 July 2026, Press Information Bureau: the National Electricity Plan's storage requirements for 2026-27 and 2031-32, the advisory on storage with solar projects, and the incentive scheme for cell factories.
  3. JMK Research, EnergyWatts: monthly update on India's energy storage market, September 2026, as hosted by the Institute for Energy Economics and Financial Analysis: tenders, awards, tariffs, commissioning and cell prices to the end of August 2026.
  4. International Energy Agency, Global Energy Review 2026, “Technology: Battery storage”.
  5. Solar Energy Corporation of India, standard battery energy storage purchase agreement, article 4.4.2: damages are charged against a round-trip efficiency of 85%, measured month by month.
  6. California Energy Commission, “California surpasses 21,000 megawatts of battery resources supporting the state's electric grid”, 7 August 2026.
  7. California Independent System Operator, Key statistics, October 2026: installed battery capacity on 31 October 2026 and the highest demand on record.
  8. Grid Controller of India, daily power supply position report: readings every 15 minutes of demand met and of generation by type of plant. Retrieved 12 November 2026 through an open copy of the reports. We have not yet read the operator's terms for reuse.
  9. Ministry of Power, press release of 9 February 2026, Press Information Bureau: “an additional minimum 97,000 MW” of coal and lignite capacity to be set up by 2034-35.
  10. Ministry of Power, reply to Lok Sabha unstarred question 697, 23 July 2026, on the two viability gap funding schemes for batteries.
  11. Ministry of Power, press release of 12 December 2023, Press Information Bureau: a capacity charge of “Rs. 10.83 lac / MW / month translating into about Rs. 10.18 / kWh” in the Solar Energy Corporation of India's bid for 500 MW and 1,000 MWh.
  12. Prime Minister's Office, “Cabinet approves Rs.14,500 crore Viability Gap Funding Scheme for development of 92 GWh Grid-Scale Energy Storage Systems”, 4 November 2026.