Why did India burn more coal in the year it added the most solar?

Because the extra demand came around the clock and the extra solar came around noon. An hour-by-hour reading of India's grid, April to September 2026.

13 November 2026 · Data to 30 September 2026

Two records in one year

From January to September 2026, India's solar plants generated 55 terawatt-hours (TWh) more than in the same months of 2025. Solar has not added as much in any year since at least 2020. In the same months coal generated 64 TWh more, and its 1,045 TWh was the most in those months since at least 2019.[1]

The usual explanation is the weather. El Niño delayed the monsoon and intensified heatwaves, cooling ran harder, and India wanted more electricity than solar's growth could cover.[2] That is true, and it is half an answer. It says how much more electricity India wanted. It does not say when.

The when is in another set of figures. India's grid operator publishes what each type of plant was generating every 15 minutes.[3] We averaged those readings over April to September, the months in which coal's rise happened, for 2025 and for 2026. This piece is what they show.

A day on the grid

The average day, April to September 2026

Gigawatts (GW), by time of day

050100150200250Midnight6 amNoon6 pmMidnightDemandCoal and ligniteSolar, 71 GW at noon120 GW at 1:15 pm172 GW at 10:45 pm
Each point is the average of that quarter-hour over 182 days. Solar here is what the operator meters, which leaves out most rooftop panels. Source: Grid Controller of India.

Follow the thick line. Before dawn, coal and lignite plants supply 77% of the electricity on India's grid. As the sun climbs they turn down. At noon solar is supplying 30% and coal 52%. Then the sun goes, and coal climbs back to 73% by 10 pm.

Demand does not follow the sun down. The thin line is as high at 10 pm as it is at noon: 232 GW against 233. Summer nights run on fans, air conditioners and lights, and no solar plant is generating.

So the coal fleet makes a daily climb. On the median day of April to September 2026, coal's highest evening reading was 55 GW above its lowest midday reading. A year before the climb was 48 GW.

What changed in a year, hour by hour

Each hour of the average day, 2026 against 2025

GW more or less than in the same hour a year before, April to September

+10+20+30012 am6 am12 pm6 pm
One column an hour, starting at midnight. A block above the zero line is a type of plant that generated more than a year before, and a block below it one that generated less. The line across a column is the change in all generation. Source: Grid Controller of India.

Start in the middle of the chart. At noon, solar's best hour, the grid carried 25 GW more than a year before. Solar supplied 18 GW of that. Hydro supplied 4 GW less than a year before, and coal made up the difference with 9 GW more. In solar's best hour of its best year, coal still generated more than the year before.

Now the right-hand side. At 10 pm the grid carried 22 GW more. The solar blocks are gone. Coal supplied 16 GW of the extra, and wind 3.

Before dawn it is plainer still. At 5 am the grid carried 22 GW more, and coal generated 21 GW more.

Three hours of the average day
Hour startingAll generation, 2026ChangeSolar, 2026ChangeCoal and lignite, 2026Change
5 am213.6+21.90.3+0.2165.3+21.0
noon234.7+24.870.3+17.7122.1+9.3
10 pm234.1+22.20.00.1171.4+16.4

Gigawatts, averaged over April to September. Change is against the same hour in 2025.

Averaged over the six hours from 10 am to 4 pm, the grid carried 26 GW more than a year before. Solar supplied 17 GW of it and coal 11. Averaged over the eleven hours from 7 pm to 6 am, it carried 21 GW more, and coal supplied 18: 85% of the extra.

These readings and Ember's monthly figures reach us by different routes, and they agree. The average days imply that coal and lignite generated about 68 TWh more in April to September 2026 than a year before. Ember's monthly figures for coal give 68 TWh.[1]

The highest readings of each year
20252026
Demand met241.8 GW3 pm, 10 June 2025270.8 GW3:45 pm, 21 May 2026
Demand met between 7 pm and 5 am237.3 GW10:30 pm, 9 June 2025253.0 GW10:30 pm, 14 July 2026
Coal and lignite generation177.7 GW11:45 pm, 24 April 2025189.0 GW10:45 pm, 3 June 2026
Solar generation72.2 GW12:15 pm, 25 December 202593.9 GW11:45 am, 10 October 2026

The highest 15-minute readings in the data we hold. 2026 runs to 11 November 2026.

The records point the same way. India's demand was highest at 3:45 pm on 21 May 2026, in daylight, with solar plants generating. The coal fleet's own record came at 10:45 pm on 3 June 2026.

Why coal does not step aside at noon

A coal unit is a boiler and a turbine, and it takes hours to bring one up from cold. A unit that will be wanted at 10 pm cannot be switched off at noon. It turns down as far as it safely can and waits for the evening.

How far it can turn down decides how much room solar has. Under a rule made in 2023, India's coal units must become able to run at 40% of their capacity. The schedule runs to the end of 2030. Its first phase, 91 units of 51,080 megawatts, was due by June 2026.[4]

The readings show how far the fleet turns down today. On the median day of April to September 2026, coal's lowest midday reading was 118 GW and its highest evening reading 171 GW. At midday the fleet ran at 69% of its evening output. That is the fleet as a whole. Some units turn down further, and some do not turn down at all.

The evening is what the fleet is kept for, and the Ministry of Power says so. At the evening peak of April to June 2026, it reported, coal plants generated about 188.8 GW, around 75% of the 251.4 GW generated.[5] Our readings match: coal's highest of the year was 189.0 GW, at 10:45 pm on 3 June 2026. The ministry plans at least 97,000 megawatts more coal and lignite capacity by 2034-35.[6]

When solar and turned-down coal together exceed what the grid wants, something is switched off, and it can be solar. How much solar is lost this way is disputed. The published counts we found differ several times over and we could not read their sources, so none is printed here.

What would carry noon into the night

Three things can move electricity from the hours it is plentiful to the hours it is short. India is building all three.

  • Batteries. On 30 September 2026 India had 14.5 gigawatt-hours (GWh) of batteries operating, able to deliver 5.3 GW. Almost all of it, 13.8 GWh, was commissioned after March 2026. Another 79.0 GWh is under construction.[7]
  • Pumped storage. Water pumped uphill at noon and run back through turbines at night. India has 7.43 GW operating at 10 projects and 15.87 GW under construction. The Central Electricity Authority projects 73.93 GW of storage by 2031-32: 47.24 GW of batteries and 26.69 GW of pumped storage.[8]
  • Demand that moves. Rules made in 2023 tell state regulators to price electricity at least 20% below the normal tariff during eight solar hours, and at the peak at least 20% above it for businesses and 10% for other consumers. They were to cover businesses from April 2024 and other consumers, except farms, from April 2025.[9] We could not establish how many states have done it.

Solar itself keeps arriving. India installed 44.61 GW in the year to March 2026, more than in any year before, and had 150.26 GW in all.[10]

What it would take

Put the readings beside the storage. Between 7 pm and 6 am, coal generated 18 GW more than a year before, on average. Over eleven hours that is about 200 GWh a night.

Coal's extra output after dark, each night, April to September 2026
about 200 GWh
Every battery operating in India on 30 September 2026, emptied once
14.5 GWh
Those, and every battery under construction
93.5 GWh
All the solar the grid operator metered on an average day
588 GWh

To hold coal's night-time output where it was in 2025, India would have had to carry about 200 GWh from day into night, every night. The batteries operating in September hold 7% of that. With everything under construction they would hold 47%. And the batteries would need filling: 200 GWh is 34% of what the metered solar plants generated on an average day.

None of this says solar failed. Around midday it supplied 66% of the extra electricity India used. India burned more coal in solar's biggest year because the extra demand came around the clock and the extra solar came around noon. Until storage is counted in hundreds of gigawatt-hours, a hot year will be met after dark the way 2026 was.

What this does not show

  • One year against one year. 2026 was a hot year. A cooler one would shrink every column in the chart. It would not move solar's blocks into the night.
  • Missing days. The copy of the reports we hold lacks some days. The 2025 average uses 165 of 183 days and the 2026 average 182.
  • Rooftop solar. The operator meters large plants. Most rooftop panels show up only as lower demand, so solar's true midday share is higher than drawn.
  • Coal and lignite together. The operator reports one figure for both. Plants that industry runs for itself are outside these readings.
  • Averages hide days. An average day is not any real day. Shortages, outages and the hottest evenings are flattened into it.
  • No person has checked these figures against the source. We have not yet read the grid operator's terms for reuse. Treat the figures with care.

Sources

  1. Ember, Monthly electricity data, retrieved 12 November 2026. Licence CC BY 4.0. India's monthly coal figures cover plants that feed the grid. Our chart of these figures is here.
  2. Centre for Research on Energy and Clean Air, writing for Carbon Brief, “India's power-sector emissions flat for two years due to clean-energy surge”, 16 September 2026.
  3. Grid Controller of India, daily power supply position report: readings every 15 minutes of demand met and of generation by type of plant, 4 November 2024 to 11 November 2026. Retrieved 12 November 2026 through an open copy of the reports. We have not yet read the operator's terms for reuse.
  4. Central Electricity Authority, notification of 15 December 2023 setting the phasing plan for flexible operation of coal-based units, as published in the Gazette of India, 18 December 2023.
  5. Ministry of Power, press release of 20 July 2026, Press Information Bureau: generation from coal plants of “about 188.8 GW (around 75% of the total generation - 251.4 GW) during non-solar peak demand hours”.
  6. Ministry of Power, press release of 9 February 2026, Press Information Bureau: a requirement of about 3,07,000 MW of coal and lignite capacity by 2034-35, and “an additional minimum 97,000 MW” to be set up.
  7. Central Electricity Authority, Status of development and deployment of Battery Energy Storage Systems in India as on 30.09.2026. It counts projects of 1 MWh or more, and credits the India Energy Storage Alliance for the figures.
  8. Press Information Bureau, “Powering India's Clean Energy Transition”, 19 October 2026: pumped storage operating and under construction, and the Central Electricity Authority's projection for 2031-32.
  9. Ministry of Power, press release of 2 August 2023, Press Information Bureau, on the Electricity (Rights of Consumers) Amendment Rules, 2023.
  10. Ministry of New and Renewable Energy, press release of 8 April 2026, Press Information Bureau: 44.61 GW of solar installed in 2025-26, of which 16.3 GW was rooftop and other distributed solar, and 150.26 GW in all on 31 March 2026.