Power plants in India
Loading the map…
Night lights: NASA Black Marble, 2016 · Plants: © OpenStreetMap contributors
What this map does not show
- Plants that nobody has mapped yet. They come from OpenStreetMap, where volunteers add them, so some regions are fuller than others.
- Rooftop solar.
- Whether a plant is generating at this moment.
- The capacity of a plant where the source does not give it. Those plants are drawn as the smallest marks.
- The outline of a solar park. A ring marks its place, not its ground.
- Any boundary. None is drawn on this map.
Data to 12 November 2026. No person has yet checked these marks against official lists.
The largest plants on this map
Loading the list…
Capacities are as the source gives them and have not been checked against official lists.
Follow a company
Choose one and the map lights the hand-typed records that name it as owner. Plants and lines from OpenStreetMap rarely name an owner, so they stay dim.
Central government company that owns and runs most of the inter-state transmission lines and substations. Source
Central government company that owns coal, gas, hydro, solar and wind power stations, directly and through subsidiaries and joint ventures. Source
Private maker of wind turbines that also builds and services wind farms. Source
Private company that builds and runs solar, wind and hybrid power plants, including the Khavda park in Gujarat. Source
Central government company that builds and runs hydroelectric stations, with some solar and wind plants. Source
Private utility that generates from coal, hydro, solar and wind, runs transmission and distribution, and makes solar cells and modules. Source
Private company that owns transmission lines and substations and distributes power in Mumbai and Mundra. Source
Solar manufacturing arm of Adani New Industries at Mundra, Gujarat, making ingots, wafers, cells and modules. Source
See 25 more companies
Public company that runs Tehri hydro and pumped storage, Khurja coal station, and wind and solar plants. Source
Private maker of solar modules and solar cells, with factories mainly in Gujarat. Source
Statutory corporation of the central, West Bengal and Jharkhand governments that generates, transmits and supplies power in the Damodar valley. Source
Gujarat government generating company, a subsidiary of Gujarat Urja Vikas Nigam, running coal, lignite, gas, hydro and solar stations. Source
Private company that runs coal, hydro, wind and solar power stations. Source
Private maker of wind turbine blades, towers, hubs and nacelles at plants in Gujarat, Madhya Pradesh and Himachal Pradesh. Source
Private company that runs wind, solar and hydro plants and is building pumped storage projects. Source
Maharashtra government generating company running coal, gas, hydro and solar stations and selling to the state distribution company. Source
Andhra Pradesh government generating company running coal, hydro and solar stations. Source
Tamil Nadu government generating company, split from TANGEDCO, running the state's coal and gas stations. Source
Telangana government generating company running coal and hydro stations. Source
Private maker of solar cells and modules with factories in Telangana and Andhra Pradesh. Source
Listed arm of Hitachi Energy making transformers, high-voltage equipment and HVDC systems in Gujarat, Karnataka and Tamil Nadu. Source
Central government company under the Ministry of Coal that mines lignite and runs lignite, coal, solar and wind power stations. Source
Private company that owns and runs coal-fired power stations in several states. Source
Private company that builds and runs wind and solar plants and also makes solar modules and cells. Source
Private utility with gas, coal, wind and solar plants and power distribution in Ahmedabad, Surat and other areas. Source
Listed infrastructure investment trust that owns inter-state transmission lines, substations and some solar and battery assets. Source
Rajasthan government generating company running coal, lignite, gas and hydro stations. Source
Karnataka government generating company running hydro and coal stations, with small wind and solar plants. Source
Private electric two-wheeler maker that also makes lithium-ion battery cells at Krishnagiri, Tamil Nadu. Source
Central government engineering company that makes boilers, turbines, generators, transformers and HVDC equipment for power stations and the grid. Source
Listed arm of GE Vernova that makes power transformers, switchgear, grid automation and HVDC equipment at five sites in India. Source
Private electrical engineering company that makes power and distribution transformers, switchgear, motors and railway equipment. Source
Private maker of power, distribution, furnace and rectifier transformers and shunt reactors, based in Ahmedabad. Source
Follow a policy
Choose one and the map lights what it bears on: the factories of the companies it awarded where the source lists them, otherwise every record of the kinds it covers.
Waives inter-state transmission charges for solar, wind, hydro, storage, green hydrogen and offshore wind projects meeting set dates, tapering 25% a year afterwards. Source
Funds a transmission link to carry power from 13 GW of planned renewable projects in Ladakh to the national grid. Outlay: Rs. 20,773.70 crore (Central Financial Assistance Rs. 8,309.48 crore). Source
Pays makers per unit sold for new integrated solar module factories; 48,337 MW of capacity was awarded across two tranches. Outlay: Rs. 24,000 crore. Source
Requires covered solar projects to use modules, and from set cut-off dates cells, from government-listed makers; about 213 GW of modules listed, August 2026. Source
Taxes imported solar cells and modules: 25% and 40% from April 2022, changed to 20% each plus a cess from 2 February 2025. Source
Gives developers land and shared infrastructure in large parks; 54 parks totalling 39,188 MW were approved by February 2026 against a 40 GW target. Source
Pays makers per unit sold to build 50 GWh of battery cell factories; 40 GWh awarded, with 10 GWh earmarked for grid storage. Outlay: ₹18,100 Crore. Source
Gives capital grants to cut the cost of grid batteries: 13,220 MWh under the first scheme and 30 GWh under the second. Outlay: ₹3,760 Cr for 13,220 MWh (first scheme); 5,400Cr through the Power System Development Fund for 30 GWh (second scheme, June 2025). Source
Requires obligated entities to procure a rising share of electricity from renewables through storage: 1% in 2023-24, rising to 4% by 2029-30. Source
Sets how states allot pumped storage sites, removes upfront premium and free-power obligation, and allows self-identified off-river sites. Source
Pays incentives for electrolyser factories and green hydrogen production, aiming at 5 million tonnes a year of green hydrogen capacity by 2030. Outlay: Rs.19,744 crore, including an outlay of Rs.17,490 crore for the SIGHT programme. Source
See 11 more policies that have no mark on this map yet
500 GW of non-fossil electricity capacity by 2030
Sets a goal of 500 GW of installed electricity capacity from non-fossil sources by 2030; 300.50 GW stood installed on 31 July 2026. Source
Renewable Consumption Obligation (earlier Renewable Purchase Obligation)
Requires distribution licensees, open access consumers and captive users to meet a rising share of consumption from renewables, reaching 43.33% in 2029-30. Source
Green Energy Corridor: Intra-State Transmission System, Phases I and II
Part-funds state transmission lines and substations to carry about 24 GW (Phase I, eight states) and 20 GW (Phase II, seven states) of renewables. Outlay: Phase I: Rs. 10,141.68 crore (Central Financial Assistance Rs. 4056.67 crore); Phase II: Rs. 12,031.33 crore (Central Financial Assistance Rs. 3970.34 crore). Source
Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM)
Subsidises small solar plants on farmland, standalone solar pumps and solarisation of grid-connected farm pumps, aiming at about 34,800 MW of solar. Outlay: ₹34,422 crore. Source
PM Surya Ghar: Muft Bijli Yojana
Subsidises rooftop solar for one crore households; 50.06 lakh households and 14.8 GW had been covered by early August 2026. Outlay: ₹75,021 crore. Source
Viability Gap Funding scheme for Offshore Wind Energy Projects
Funds the first 1 GW of offshore wind, 500 MW each off Gujarat and Tamil Nadu, and the upgrade of two ports. Outlay: Rs.7453 crore. Source
Revamped Distribution Sector Scheme (RDSS)
Gives distribution utilities funds for loss-reduction works and smart metering, with releases tied to performance on losses and finances. Outlay: Rs. 3,03,758 crore (estimated Gross Budgetary Support Rs. 97,631 crore). Source
Nuclear Energy Mission: 100 GW of nuclear capacity by 2047
Sets a goal of 100 GW of nuclear capacity by 2047, from 8.78 GW now, and funds five small modular reactors by 2033. Outlay: ₹20,000 crore. Source
Sustainable Harnessing and Advancement of Nuclear Energy for Transforming India (SHANTI) Act, 2025
Consolidates India's nuclear laws, opens nuclear power to private participation under regulation and gives the Atomic Energy Regulatory Board statutory status. Source
Carbon Credit Trading Scheme (Indian Carbon Market)
Sets emission-intensity targets for 490 industrial entities in seven sectors, who trade carbon credit certificates; power stations are not among the covered sectors. Source
Tariff Based Competitive Bidding (TBCB) for transmission projects
Awards transmission projects to the bidder quoting the lowest yearly tariff, with bidding run by bid process coordinators under the Ministry of Power. Source