Grid Search

India's working batteries grew from 0.8 GWh to 14.5 GWh in six months of 2026

The Central Electricity Authority expects 32 gigawatt-hours (GWh) in operation by the end of March 2027.

  • 31 March 20250.2 GWh
  • 31 March 20260.8 GWh
  • 30 September 202614.5 GWh
  • 31 March 2027Expected32.1 GWh

Gigawatt-hours in operationDashed: expected, not built

Each bar is the storage in India's grid batteries on one date: how much electricity they hold when full, in gigawatt-hours. The dashed bar is what the Central Electricity Authority expects. It is not built.

Between 1 April and 30 September 2026, 13.8 GWh came into operation. That is 17 times the 0.8 GWh commissioned in all the years before.

The 14.5 GWh sit in 19 projects that can deliver 5.3 GW between them. Another 79 GWh, in 63 projects, were under construction on 30 September 2026. The authority counts a project as under construction once its purchase agreement is signed.

Counts differ. The authority lists projects of 1 MWh or more and credits the India Energy Storage Alliance for the figures. JMK Research counted 9.6 GWh at the end of August 2026. We use the authority's count and cannot reconcile the two.

What the batteries do to India's coal plants is the subject of a story: What will India's batteries do to its coal plants?

No person has yet checked this chart against the source. Until one has, treat the figures with care.

Kind of figure
Reported, as the authority published them, in megawatt-hours. The total on each date is estimated, which here means we added the authority's figures for each year. The last bar is the authority's expectation.
Source
Central Electricity Authority, Status of development and deployment of Battery Energy Storage Systems in India as on 30.09.2026. Data to 30 September 2026. Read 13 November 2026.
Version
1 · 13 November 2026
Cite as
Grid Search, Seed 42 Labs (2026). India's working batteries grew from 0.8 GWh to 14.5 GWh in six months of 2026. Version 1, 13 November 2026. Data: Central Electricity Authority, status of battery energy storage systems as on 30 September 2026, read 13 November 2026.
Download
Not offered. Every figure drawn is in the table below.
How this chart was made
Show the figures as a table
Battery storage commissioned in India in each period, and the total in operation at its end, in megawatt-hours
PeriodCommissioned, MWhIn operation at its end, MWh
To 31 March 2025216216
1 April 2025 to 31 March 2026575790
1 April to 30 September 202613,75314,543
1 April 2026 to 31 March 2027, expected31,26732,057

A megawatt-hour is a thousandth of a gigawatt-hour. The last row is what the authority expects for the whole year to 31 March 2027, and includes the row above it. Source: Central Electricity Authority.

Place: IndiaTheme: Storage